Bathroom Plumbing Remodeling in Henderson, NV
- 24/7 Emergency Service
- Financing Available
- A+ BBB Rated
- Licensed & Insured
What Does Bathroom Plumbing Remodeling Include?
Bathroom plumbing remodeling is the pipe work inside a bathroom project. We rough in the new supply and drain lines while the walls are open, then we set each fixture and test it.
Most projects start with a layout change. Move the shower or the vanity, and the pipe under it has to follow. A walk-in shower in place of a tub needs new lines in the wall. So does a second sink.
While the wall is open, we look at the old pipe too. Worn supply lines or valves get pointed out before the tile goes up. That way you can swap them now and leave the new tile alone later.

Here’s the plumbing we handle in a bathroom remodel:
- Rough-in. We lay in the supply and drain lines while the walls are open.
- Toilets. We set and connect your new toilet.
- Sinks and faucets. Set in the vanity, hooked up, and run for leaks.
- Showers and tubs. New valves and drains, including tub-to-shower conversions.
- Bidets. A water line run to the bidet.
- Moved fixtures. If the layout changes, we run new lines to the new spot.
- Old pipes. Worn supply lines come out while we can still reach them.
- Shutoff valves. One at each fixture, with every joint checked for drips.
We test your new fixtures before we leave.
Related Services
A bathroom remodel often touches more than the bathroom. These related services tend to come up in the same project. Each one has its own page that explains the work. If you're stuck between two, ask us at the walkthrough.
Whole-house repiping
When the wall opens on worn pipe, we can repipe the whole house during the same project. That keeps you from opening new tile later to fix a leak in an old line.
See whole-house repiping detailsKitchen plumbing remodeling
Doing the kitchen too? We hook up the plumbing for sinks, faucets, disposals, and dishwashers there as well.
See kitchen plumbing remodeling detailsLeak detection
A stain on a wall or ceiling can point to a hidden leak. We use electronic equipment to find the source before the remodel covers it up.
See leak detection detailsPlumbing installation
Bathroom remodels are one part of our plumbing installation work. That page covers the rest of what we install, from fixtures to new water lines.
See plumbing installation detailsBathroom Plumbing Across Henderson

Our crews plumb bathroom remodels across Henderson. Some of the homes are decades old. Others are only a few years in.
Lake Mead supplies our water, and it measures 16 to 18 grains of hardness a gallon. That scale is why a faucet starts to weep and a shower valve wears out early. Most houses here are built on a concrete slab, so a moved drain means cutting the floor.
Green Valley. A lot of bathrooms here date to the 1980s and 1990s, original pipes and all. Open a wall for a new shower and we check those lines, so you can choose to swap them while the tile is off.
Seven Hills and MacDonald Highlands. Big master baths are common here, often with two vanities and a walk-in shower. We plan where each extra drain goes with you before rough-in starts.
Anthem. Owners here add half baths and turn garage space into rooms with a bathroom of their own. A brand-new bathroom has to tie into the drain and water lines already in the house, and on a slab we map that route before anything gets cut.
Inspirada and Cadence. Homes here are the city’s newest, and the pipe behind the wall is young. So the work is mostly about where things go and which fixtures you picked.
Signs Your Bathroom Plumbing Needs an Update
Plumbing changes are easiest to plan before the demo starts. Bring us in early when the plan has one of these in it:
Shifting the shower or tub somewhere new.
Swapping a tub for a walk-in shower.
Adding a second sink to the vanity.
Moving the toilet to a different wall.
Opening a wall and finding old supply lines.
Adding a bathroom where there wasn’t one.
Pipe work belongs ahead of the tile. A water stain on the ceiling may mean a leak you can’t see, and leak detection in Henderson tracks it down before the walls close.
How Bathroom Remodel Plumbing Works
We work in two stages, one before the tile and one after. Stage one is rough-in, done with the studs showing. Fixtures wait for stage two.
We walk the layout
Bring your plan. We mark each fixture as staying or moving.
You approve the number
The plumbing price goes on paper first. No pipe gets cut until you sign off.
Pipe in the open wall
Supply and drain lines get run before anyone hangs drywall.
Fixtures after tile
After the tile and paint, the faucets go on. Showerheads and the toilet follow.
Leak and flow check
Each fixture runs while we look for drips and weak flow. Then we show you the finished room.
Why Henderson Homeowners Choose Pure Plumbing & Air
We’ve served the Las Vegas valley since 2013, and every visit runs the same way.
Locally owned since 2013Family-owned and operated in Las Vegas.
Licensed, bonded and insured in NevadaContractor licenses #77906 and #88741.
A+ BBB ratingRated A+ by the Better Business Bureau.
24/7 serviceA staffed phone, every hour.
Written estimates before work beginsNo surprise charges.
Honest recommendationsWe tell you when repair makes sense and when replacement is the better value.
Pure Plan MembershipPriority scheduling, discounted services and regular maintenance.
Plumbing Services
We serve the whole Las Vegas valley All 17 areas
Bathroom Plumbing Remodeling in Henderson. Same trucks and same technicians across all 17 areas below. Same trucks, same plumbers, and the hard water every neighborhood here shares.
West valley
North valley
East & south
Bathroom Plumbing Remodeling FAQs for Henderson, NV
We handle the pipes and set the fixtures. New lines go in while you can still see the studs.
It comes down to your layout, how many fixtures go in, and whether any pipe moves. You get the price in writing before we start. The estimate is free.
Yes. Wherever the toilet or shower lands, a new drain has to reach it, and so does a supply line.
Yes. Keep the fixtures where they sit now and there’s far less pipe to touch. We still look over the old lines while the wall is open.
Yes. Our part is the new shower valve and drain. Your remodeler handles the walls and tile.
An open wall is your best chance to check. We look at the lines behind it and tell you what shape they’re in. You decide.